What needs a permit in Sturgeon County, who issues it, what it costs and who to call, gathered from the County's own pages and fee schedules.
Get pre-qualified in 60 secondsCall or text 587-400-7117| Issued by | Sturgeon County Planning and Development Services, 9613 100 Street, Morinville |
| How to apply | Sturgeon County online permitting (CityWorks portal) |
| Phone | 780-939-8275 (main line 780-939-4321) |
| pandd@sturgeoncounty.ca | |
| Zoning rules | Sturgeon County Land Use Bylaw |
| Project | Rule |
|---|---|
| New house | Development permit and building permit, plus electrical, plumbing, gas and private sewage permits as needed |
| Accessory building | Development and building permits at 10 m² and up |
| Deck | Development and building permits |
| Basement development, hot tub, pool | Building permit |
| Farm building | No permit, but a declaration is required; it must be on agricultural land and directly support the farm |
| Fence | Usually no permit if it meets height and placement rules (for example up to 1.83 m in rear and side yards in residential districts) |
| Patio | No permit if within the minimum yard setbacks |
Rules change and every property is different. Confirm with the municipality before you start.
| Item | Fee |
|---|---|
| Subdivision application | $3,000 for one parcel plus $200 for each additional parcel |
Source: Sturgeon County online permitting page (2026 fee schedule, Bylaw 1641/23/2024). Most Edmonton-area municipalities add the provincial Safety Codes Council levy to building and trade permits: 4% of the permit fee, minimum $4.50 and maximum $560 (2026 fee schedules for Beaumont and Fort Saskatchewan).
Usually both for new homes, garages, larger accessory buildings and many decks. The development permit covers use, size and location; the building permit covers how it is built under the safety codes.
Sturgeon County Planning and Development Services: 780-939-8275 (main line 780-939-4321).
The municipality can order the work stopped, opened up for inspection or removed, and some charge double permit fees. Unpermitted work can also cause problems when you sell. See our building guides.
Tell us the address and what you want to build. We will check the zoning and the permits it needs before you buy or start, and connect you with the right builder or trades.
Sources: Sturgeon County online permitting page.
General information only, not legal, tax or financial advice. Have your lawyer review contracts and talk to your accountant about tax. Figures are dated and change. Haupt Phaneuf Real Estate Team, eXp Realty. Call or text 587-400-7117.