Permits · Leduc County

Building and Development Permits in Leduc County

What needs a permit in Leduc County, who issues it, what it costs and who to call, gathered from the County's own pages and fee schedules.

Get pre-qualified in 60 secondsCall or text 587-400-7117

Who issues permits in Leduc County

Issued byLeduc County Planning and Development, 101-1101 5 Street, Nisku
How to applyLeduc County application forms (digital PDF plans)
Phone780-770-9322
Emailsafetycodes@leduc-county.com
Zoning rulesLeduc County Land Use Bylaw

What needs a permit

ProjectRule
New houseBuilding permit with site plan, construction plans and fire safety plan; new home warranty or exemption confirmation; builder must hold a provincial licence
EngineeringUsually required for truss plans, tall walls, pile or grade beam foundations and in-floor heating
OccupancyNo one may occupy new construction until the County grants permission to occupy

Rules change and every property is different. Confirm with the municipality before you start.

Fees

Leduc County charges fees under its current fee schedule, plus the Safety Codes Council levy (the greater of $4.50 or 4% of the fee).

The usual order

  1. Check the zoning (land use district) for the property.
  2. Apply for a development permit if the project needs one. It covers what and where: use, size, setbacks and height.
  3. Apply for a building permit. It covers how the work is built under the Alberta Building Code and the Safety Codes Act.
  4. The trades pull electrical, plumbing, gas and, on rural land, private sewage permits.
  5. Book inspections at each stage, then get final approval or occupancy before you move in.

Leduc County permit questions

Do I need a development permit and a building permit in Leduc County?

Usually both for new homes, garages, larger accessory buildings and many decks. The development permit covers use, size and location; the building permit covers how it is built under the safety codes.

Who do I call about permits in Leduc County?

Leduc County Planning and Development: 780-770-9322.

What happens if I build without a permit?

The municipality can order the work stopped, opened up for inspection or removed, and some charge double permit fees. Unpermitted work can also cause problems when you sell. See our building guides.

Planning a build or a renovation?

Tell us the address and what you want to build. We will check the zoning and the permits it needs before you buy or start, and connect you with the right builder or trades.

Call or text 587-400-7117

Sources: Leduc County residential building permit application (Rev. 02 2025).

General information only, not legal, tax or financial advice. Have your lawyer review contracts and talk to your accountant about tax. Figures are dated and change. Haupt Phaneuf Real Estate Team, eXp Realty. Call or text 587-400-7117.

Data last updated on November 29, 2026 at 07:30 PM (UTC).
Copyright 2026 by the REALTORS® Association of Edmonton. All Rights Reserved.
Data is deemed reliable but is not guaranteed accurate by the REALTORS® Association of Edmonton.
The trademarks REALTOR®, REALTORS® and the REALTOR® logo are controlled by The Canadian Real Estate Association (CREA) and identify real estate professionals who are members of CREA. The trademarks MLS®, Multiple Listing Service® and the associated logos are owned by CREA and identify the quality of services provided by real estate professionals who are members of CREA.