Permits · Leduc

Building and Development Permits in Leduc

What needs a permit in Leduc, who issues it, what it costs and who to call, gathered from the City's own pages and fee schedules.

Get pre-qualified in 60 secondsCall or text 587-400-7117

Who issues permits in Leduc

Issued byCity of Leduc Planning and Development (development permit approved before the building permit)
How to applyCityView portal (cityview.leduc.ca)
Phone780-980-7124 (Civic Centre 780-980-7177)
EmailSee the municipal website
Zoning rulesCity of Leduc Land Use Bylaw 809-2013

What needs a permit

ProjectRule
Permit typesNew homes, detached garages, sheds, decks (covered and uncovered), hot tubs and pools, additions, secondary suites, home occupations
ExemptSmaller sheds, fences and some decks may not need a development permit
FenceNo permit within limits: 1.8 m in rear and interior side yards, 1.0 m forward of the house

Rules change and every property is different. Confirm with the municipality before you start.

Published fees

ItemFee
Appeal to the Subdivision and Development Appeal Board$125, within 21 days of the decision

Source: City of Leduc development permits page. Most Edmonton-area municipalities add the provincial Safety Codes Council levy to building and trade permits: 4% of the permit fee, minimum $4.50 and maximum $560 (2026 fee schedules for Beaumont and Fort Saskatchewan).

The usual order

  1. Check the zoning (land use district) for the property.
  2. Apply for a development permit if the project needs one. It covers what and where: use, size, setbacks and height.
  3. Apply for a building permit. It covers how the work is built under the Alberta Building Code and the Safety Codes Act.
  4. The trades pull electrical, plumbing, gas and, on rural land, private sewage permits.
  5. Book inspections at each stage, then get final approval or occupancy before you move in.

Leduc permit questions

Do I need a development permit and a building permit in Leduc?

Usually both for new homes, garages, larger accessory buildings and many decks. The development permit covers use, size and location; the building permit covers how it is built under the safety codes.

Who do I call about permits in Leduc?

City of Leduc Planning and Development: 780-980-7124 (Civic Centre 780-980-7177).

What happens if I build without a permit?

The municipality can order the work stopped, opened up for inspection or removed, and some charge double permit fees. Unpermitted work can also cause problems when you sell. See our building guides.

Planning a build or a renovation?

Tell us the address and what you want to build. We will check the zoning and the permits it needs before you buy or start, and connect you with the right builder or trades.

Call or text 587-400-7117

Sources: City of Leduc development permits page.

General information only, not legal, tax or financial advice. Have your lawyer review contracts and talk to your accountant about tax. Figures are dated and change. Haupt Phaneuf Real Estate Team, eXp Realty. Call or text 587-400-7117.

Data last updated on November 29, 2026 at 07:30 PM (UTC).
Copyright 2026 by the REALTORS® Association of Edmonton. All Rights Reserved.
Data is deemed reliable but is not guaranteed accurate by the REALTORS® Association of Edmonton.
The trademarks REALTOR®, REALTORS® and the REALTOR® logo are controlled by The Canadian Real Estate Association (CREA) and identify real estate professionals who are members of CREA. The trademarks MLS®, Multiple Listing Service® and the associated logos are owned by CREA and identify the quality of services provided by real estate professionals who are members of CREA.