Building a house in Edmonton runs through twelve stages, from choosing a lot to your first-year warranty check. Most delays and budget surprises come from decisions made late, so the stages where you choose things (design, selections, contract) matter as much as the ones where crews are on site.
Get pre-qualified in 60 secondsCall or text 587-400-7117Watch: 10 Tips for Building a New Home in Edmonton (Haupt Phaneuf Real Estate Team on YouTube).
| # | Stage | What happens | What to check |
|---|---|---|---|
| 1 | Lot | Buy or secure the lot | Zoning, servicing, architectural controls, soil |
| 2 | Design | Plans drawn and engineered | Layout, window placement, garage size |
| 3 | Pricing and contract | Fixed-price or cost-plus agreement | Allowances, change-order pricing, schedule, deposits |
| 4 | Financing | Construction (draw) mortgage arranged | Draw schedule matches the contract |
| 5 | Permits | Development and building permits issued | Approved plans match the contract |
| 6 | Excavation and foundation | Dig, footings, foundation walls, damp-proofing | Grades, foundation drainage |
| 7 | Framing | Floors, walls, roof structure, sheathing | Square, level, beams and point loads per plans |
| 8 | Roof, windows and rough-ins | Roof, windows, plumbing, electrical, HVAC rough-ins | Window flashing, duct runs, outlet locations |
| 9 | Pre-drywall inspection | City inspections and your own walk-through | Insulation, vapour barrier, blocking for TV mounts and grab bars |
| 10 | Finishing | Drywall, paint, cabinets, flooring, trim, fixtures | Finishes match your selections |
| 11 | Occupancy and walkthrough | Final inspections, occupancy, possession walkthrough | Written deficiency list signed by the builder |
| 12 | Warranty | 1-2-5-10 coverage begins | Defect log, 11-month inspection |
We help clients find the lot, compare builders, review contracts and walk the home at pre-drywall and possession. See how long it takes and what it costs.
Lot, design, contract, financing, permits, excavation and foundation, framing, rough-ins, pre-drywall inspection, finishing, occupancy and walkthrough, then warranty.
At pre-drywall, at the possession walkthrough, and again at about 11 months before the 1-year warranty period ends.
Usually a development permit and a building permit, plus trade permits for plumbing, gas, heating and electrical, followed by City inspections.
Tell us your budget, the area and the kind of home you want. Mathew, who has managed hundreds of home builds, will help you match a lot and a builder and check the contract before you sign.
Sources: City of Edmonton new home construction pages; Government of Alberta new home warranty overview; our team's construction experience.
General information only, not legal, tax, immigration or financial advice. Figures are dated and change. Haupt Phaneuf Real Estate Team, eXp Realty. Call or text 587-400-7117.