Building a home · Process

The Home Building Process, Start to Finish

Building a house in Edmonton runs through twelve stages, from choosing a lot to your first-year warranty check. Most delays and budget surprises come from decisions made late, so the stages where you choose things (design, selections, contract) matter as much as the ones where crews are on site.

Get pre-qualified in 60 secondsCall or text 587-400-7117

Watch: 10 Tips for Building a New Home in Edmonton (Haupt Phaneuf Real Estate Team on YouTube).

The 12 stages

#StageWhat happensWhat to check
1LotBuy or secure the lotZoning, servicing, architectural controls, soil
2DesignPlans drawn and engineeredLayout, window placement, garage size
3Pricing and contractFixed-price or cost-plus agreementAllowances, change-order pricing, schedule, deposits
4FinancingConstruction (draw) mortgage arrangedDraw schedule matches the contract
5PermitsDevelopment and building permits issuedApproved plans match the contract
6Excavation and foundationDig, footings, foundation walls, damp-proofingGrades, foundation drainage
7FramingFloors, walls, roof structure, sheathingSquare, level, beams and point loads per plans
8Roof, windows and rough-insRoof, windows, plumbing, electrical, HVAC rough-insWindow flashing, duct runs, outlet locations
9Pre-drywall inspectionCity inspections and your own walk-throughInsulation, vapour barrier, blocking for TV mounts and grab bars
10FinishingDrywall, paint, cabinets, flooring, trim, fixturesFinishes match your selections
11Occupancy and walkthroughFinal inspections, occupancy, possession walkthroughWritten deficiency list signed by the builder
12Warranty1-2-5-10 coverage beginsDefect log, 11-month inspection

Lessons from the job site

  • Lock structural and layout decisions before permits. Changes after framing cost the most.
  • Walk the home at pre-drywall. It is the last time you can see what is inside the walls.
  • Keep every change order in writing, with its price, before the work is done.
  • Plan landscaping, fencing and window coverings in the budget from day one.

How we help

We help clients find the lot, compare builders, review contracts and walk the home at pre-drywall and possession. See how long it takes and what it costs.

Process questions

What are the stages of building a house?

Lot, design, contract, financing, permits, excavation and foundation, framing, rough-ins, pre-drywall inspection, finishing, occupancy and walkthrough, then warranty.

When should I inspect a new build?

At pre-drywall, at the possession walkthrough, and again at about 11 months before the 1-year warranty period ends.

What permits do I need to build a house in Edmonton?

Usually a development permit and a building permit, plus trade permits for plumbing, gas, heating and electrical, followed by City inspections.

Thinking about building?

Tell us your budget, the area and the kind of home you want. Mathew, who has managed hundreds of home builds, will help you match a lot and a builder and check the contract before you sign.

Call or text 587-400-7117

Sources: City of Edmonton new home construction pages; Government of Alberta new home warranty overview; our team's construction experience.

General information only, not legal, tax, immigration or financial advice. Figures are dated and change. Haupt Phaneuf Real Estate Team, eXp Realty. Call or text 587-400-7117.

Data last updated on November 29, 2026 at 07:30 PM (UTC).
Copyright 2026 by the REALTORS® Association of Edmonton. All Rights Reserved.
Data is deemed reliable but is not guaranteed accurate by the REALTORS® Association of Edmonton.
The trademarks REALTOR®, REALTORS® and the REALTOR® logo are controlled by The Canadian Real Estate Association (CREA) and identify real estate professionals who are members of CREA. The trademarks MLS®, Multiple Listing Service® and the associated logos are owned by CREA and identify the quality of services provided by real estate professionals who are members of CREA.