Building and Development Permits in Edmonton

What needs a permit in Edmonton, who issues it, what it costs and who to call, gathered from the City's own pages and fee schedules.

Get pre-qualified in 60 secondsCall or text 587-400-7117

Who issues permits in Edmonton

Issued byCity of Edmonton (development permits and building permits; trade permits for electrical, plumbing, gas and HVAC)
How to applyCity of Edmonton online permit portal (selfserve.edmonton.ca)
Phone311 (780-442-5311 from outside Edmonton)
Emaildevelopmentpermits@edmonton.ca
Zoning rulesZoning Bylaw 20001 (in effect since January 1, 2024; RS zone changes expected January 2027)

What needs a permit

ProjectRule
New houseDevelopment permit and building permit
Detached garage or shedPermit needed if larger than 10 m² (108 sq ft), if it has electrical, plumbing or gas, if it breaks height or setback rules, or if it is in the river valley overlay
DeckBuilding permit if any part is more than 0.6 m above grade. Development permit if it is in a front or flanking yard, more than 1.2 m high, covered, or in the river valley overlay
FenceDevelopment permit only if over height: 1.3 m in front and flanking yards, 2.0 m in rear and interior side yards
Secondary suite (basement)Development and building permits; allowed where single detached, semi-detached and row houses are allowed
Basement development or renovationBuilding permit (Home Improvement Permit), plus trade permits
DemolitionDemolition permit
Short-term rental (Airbnb)Residential Rental Accommodation (Short-Term) business licence for each dwelling

Rules change and every property is different. Confirm with the municipality before you start.

Published fees

ItemFee
Detached garage, typical minimumDevelopment $145 + building $120 + Safety Codes $4.80 = $269.80

Source: City of Edmonton detached garage page, citing the 2026 fee schedules. Most Edmonton-area municipalities add the provincial Safety Codes Council levy to building and trade permits: 4% of the permit fee, minimum $4.50 and maximum $560 (2026 fee schedules for Beaumont and Fort Saskatchewan).

How long permits take (Q1 2026)

PermitAverage processing time
Development permit, greenfield (new areas)9 days (2 days when auto-reviewed)
Development permit, infill80 days
Building permit, new house, greenfield17 days
Building permit, new house, infill37 days
Home improvement, simple project15 days
Home improvement, regular project50 days

Source: City of Edmonton Q1 2026 Development Services report.

Infill rules are changing

In October 2026 the Government of Alberta directed Edmonton to roll back its 2024 infill zoning. As of November 27, 2026, the city expects to change the RS zone in January 2027 so that rowhouses and multiplexes are limited to sites that were zoned RF3 before 2024, with minimum parking returning (Taproot Edmonton). See our zoning guide.

The usual order

  1. Check the zoning (land use district) for the property.
  2. Apply for a development permit if the project needs one. It covers what and where: use, size, setbacks and height.
  3. Apply for a building permit. It covers how the work is built under the Alberta Building Code and the Safety Codes Act.
  4. The trades pull electrical, plumbing, gas and, on rural land, private sewage permits.
  5. Book inspections at each stage, then get final approval or occupancy before you move in.

Edmonton permit questions

Do I need a development permit and a building permit in Edmonton?

Usually both for new homes, garages, larger accessory buildings and many decks. The development permit covers use, size and location; the building permit covers how it is built under the safety codes.

Who do I call about permits in Edmonton?

City of Edmonton: 311 (780-442-5311 from outside Edmonton).

What happens if I build without a permit?

The municipality can order the work stopped, opened up for inspection or removed, and some charge double permit fees. Unpermitted work can also cause problems when you sell. See our building guides.

Do I need a permit for a shed in Edmonton?

Not if it is 10 m² (108 sq ft) or smaller, unattached, has no electrical, plumbing or gas, and meets height and setback rules. Larger sheds need a permit.

How long does a building permit take in Edmonton?

In Q1 2026 the City averaged 17 days for a new house in a new area and 37 days for an infill house. Infill development permits averaged 80 days.

Planning a build or a renovation?

Tell us the address and what you want to build. We will check the zoning and the permits it needs before you buy or start, and connect you with the right builder or trades.

Call or text 587-400-7117

Sources: City of Edmonton permit pages (garage and shed, deck, fence, secondary suites, short-term rentals); City of Edmonton Q1 2026 Development Services report; Taproot Edmonton (November 27, 2026).

General information only, not legal, tax or financial advice. Have your lawyer review contracts and talk to your accountant about tax. Figures are dated and change. Haupt Phaneuf Real Estate Team, eXp Realty. Call or text 587-400-7117.

Data last updated on November 29, 2026 at 07:30 PM (UTC).
Copyright 2026 by the REALTORS® Association of Edmonton. All Rights Reserved.
Data is deemed reliable but is not guaranteed accurate by the REALTORS® Association of Edmonton.
The trademarks REALTOR®, REALTORS® and the REALTOR® logo are controlled by The Canadian Real Estate Association (CREA) and identify real estate professionals who are members of CREA. The trademarks MLS®, Multiple Listing Service® and the associated logos are owned by CREA and identify the quality of services provided by real estate professionals who are members of CREA.